A lifted or cracked sidewalk in front of your house is not the same job as a private walk on your lot. This guide explains when a full sidewalk replacement is likely, how City of Los Angeles rules and the Safe Sidewalks LA rebate fit in (including the waitlist), which permits apply, and what to ask before you hire. For smaller patches, see our concrete repair guide.
Public sidewalk vs. the walk on your lot
Most front yards have two different pieces of concrete:
- Private walkway: the path on your lot to your door or side gate. See walkways and steps.
- Public sidewalk: the walk along the street that the public uses. Work there is controlled by the Bureau of Engineering. City code also assigns the lot owner a maintenance duty for the sidewalk and related curb/apron areas fronting the lot (LAMC 62.104; StreetsLA).
This page is about the public sidewalk.
Repair a section, or replace a stretch?
Not every bad sidewalk needs a full tear-out. A contractor who sees the site should explain which fits:
- Smaller fix: a trip edge that can be ground, a short crack that can be sealed, or one sunken panel that can be lifted—when the rest of the walk is sound. Those options are on the repair page.
- Replace panels or a longer stretch: broken pieces, long runs lifted by roots, a slope that fails accessibility rules, or old patches that keep failing. For rebate work, the City expects its standard sidewalk design—not decorative materials (Safe Sidewalks LA FAQ).
Widespread lifting usually points to roots or a soft base under the walk. A surface patch will not fix that. Ask the contractor to show which panels must come out and why.
Owner duty, notices, and enforcement
Under LAMC 62.104, the owner of a lot must maintain the sidewalk, driveway approach, curb return and curb on or fronting the lot so they do not endanger people or violate the Americans with Disabilities Act (LAMC 62.104). StreetsLA notes the City has suspended enforcement of that duty in some circumstances, but the duty itself remains in the code, and some building permits can trigger a repair requirement (StreetsLA FAQ). This page is general information, not legal advice about liability in a specific accident or claim.
If the City posts a Notice of Non-Compliance and Order to Repair, the notice sets deadlines. If the owner does not act, the code allows the City to make the repair and record the cost as a lien (LAMC 62.104). A notice job is different from a voluntary rebate job—read the notice and ask the Bureau of Engineering what it requires.
Two paths: City rebate, or hire on your own schedule
Safe Sidewalks LA rebate (voluntary)
The City runs a rebate program for owners who voluntarily repair public sidewalk that does not meet accessibility rules. From the City’s own pages:
- Waitlist: new applications are currently placed on a waitlist because of funding restrictions (Safe Sidewalks LA Rebates).
- What it covers: public sidewalk that fails listed accessibility criteria (for example a trip edge over a quarter inch, a walk that is too narrow, or a slope problem). Brand-new sidewalk where none exists is not eligible. Work required by a building permit is not eligible. Current examples and limits are on the City rebate FAQ.
- Driveway apron: included only when the apron must be changed to make the sidewalk compliant—not when the apron is damaged but the sidewalk can be fixed without touching it (FAQ).
- Who pays the contractor: you do. The City reimburses you after the work is certified; it does not pay the contractor directly (FAQ).
- How much the rebate can be: the City sets an offer after it inspects your property. Offer caps and unit amounts change over time—use the City rebate FAQ for the current numbers, not a website estimate.
- After the City certifies the work: residential properties get a limited City warranty period (one warranty repair), then maintenance responsibility returns to the owner under the program rules (FAQ).
Deadlines are strict. Apply at sidewalks.lacity.org or through 311. After the City emails a rebate offer, you have a short window to accept or decline; then limited time to hire a qualifying contractor, pull the no-fee permits linked in the offer, finish the work, and meet for a required pre-construction meeting. The W-9 for payment must be submitted in person or by U.S. mail only. Follow the City checklist. If you still want a rebate, do not finish the job under an old permit first—the FAQ says that can make the repair ineligible (FAQ).
Hire without waiting for the rebate
You can repair or replace the sidewalk on your own schedule with a Bureau of Engineering A-Permit, without the rebate. When street-tree roots caused the damage, BOE can issue a sidewalk-repair A-Permit at no fee if you send a photo; if roots must be cut, get the A-Permit first, then the StreetsLA tree permit (BOE; StreetsLA). You pay the full job with no City rebate, but you are not stuck behind the waitlist. Ask every contractor which path their quote assumes.
Tree roots
Roots are a common reason LA sidewalks lift. The City does not root prune parkway trees to prevent damage; owners may prune at their own expense with a no-fee StreetsLA permit. StreetsLA inspects and can require a redesign that saves the roots, or deny cutting (StreetsLA; root prune permits).
Under the rebate program, a City arborist decides what tree work is needed. If a street tree must be removed, City policy requires two replacement trees for every one removed, with rules about who pays for the tree at the removal site. Private trees on your lot are not covered by the rebate, but if the City requires private-tree work for eligibility, that work must be done (FAQ).
Permits and licensed contractors
Public-sidewalk work needs a Bureau of Engineering A-Permit when the job matches existing grades without engineered plans (BOE). For rebate jobs, use only the no-fee permit links in the offer email—do not go to a public counter for those (checklist).
For rebate construction, the City requires a contractor licensed in one of these classes: A, C-8, C-12, or C-61/D-06. You choose and hire the contractor. The City may publish a reference list; it does not endorse those firms (FAQ). Verify any license at cslb.ca.gov before you pay a deposit.
This page is for the City of Los Angeles. West Hollywood, Burbank and other cities have their own rules—see our West Hollywood guide if that is your city.
What to do while the rebate is waitlisted
- Photograph the whole frontage and the worst trip edges.
- Decide whether you can wait in the rebate queue or need the walk fixed sooner for safety.
- If you wait: submit the request so you are on the list, and keep the confirmation (Rebates).
- If you cannot wait: get written quotes that spell out the work area, tree work, apron work, who pulls permits, and the schedule—then use the normal A-Permit path.
- If a rebate is your goal, do not start that track until you have an official offer and the linked permits (FAQ).
Questions to ask before you sign
- Is this the public sidewalk, my private walk, or both? Show me the cut lines.
- Are we repairing panels or replacing a stretch, and why?
- Does this quote assume a Safe Sidewalks LA rebate, or a self-funded permit job?
- Which license class will you use for rebate work?
- Who pulls the A-Permit and any tree permit, and is that included?
- Will the new walk follow the City standard plan?
FAQ
Can I fix only part of the sidewalk and still get a rebate?
To receive a rebate, the entire sidewalk fronting the property must meet the program’s accessibility standard when the rebate is issued (FAQ).
Can I use decorative concrete or pavers on the public sidewalk?
The rebate FAQ says the City’s standard sidewalk plan must be used (FAQ). Ask the Bureau of Engineering before you plan anything else in the public right-of-way.
My building permit says I must fix the sidewalk. Can I use the rebate?
No. Sidewalk work required by a building permit or similar requirement is not eligible (FAQ).
How much will the rebate cover?
The City calculates an offer after it inspects your sidewalk. Caps and unit amounts are published on the City rebate FAQ and can change. A contractor still has to see the site to price the work itself.
Sources
- LAMC Sec. 62.104
- StreetsLA FAQ
- StreetsLA policies
- StreetsLA tree root prune permits
- BOE A-Permit manual
- Safe Sidewalks LA Rebates
- Safe Sidewalks LA Rebate FAQ
- Rebate application checklist
- Contractors State License Board
This page is general information, not legal or permit advice. Program rules and waitlist status change; confirm on the City pages before you apply or pour. LA Concrete Quotes is a free referral service, not a licensed contractor. We do not perform sidewalk work.
Related projects
- Driveway Replacement & New Driveways
- Concrete Patios
- Stamped & Decorative Concrete
- Walkways, Paths & Steps
- Concrete & Sidewalk Repair
- Driveway cost guide
Local guides
Permit offices and local rules differ by neighborhood. Read the guide for your area: